HomeTrack Record
Market Proof

Reliability
documented.
Proven at scale.

We bridge the gap between financial ambition and technical reality for institutional investors, IPPs and developers across Europe.

Every entry below is a signed mandate — no pipeline, no ambitions. Where a client has not authorised the use of its name, the work is published anonymised: the scope stays, the brand doesn't. Click any market on the map to filter the record by country.

14Markets
26Mandates outside Spain
5Markets with repeat work
Where the mandates are

14 markets

The markets our work reaches, from the Iberian core outwards. Click a market to filter the record.

Credentials are the mandate record: what we were hired to do, what we delivered, at what scale and in which market. Where a full project dossier is published, the record links to it.

Phase
Client
Advisory2022
Octopus Energy logo
BESS business model and market-entry framework, Spain

BESS business model and market-entry framework, Spain

Commercial and technical framework for storage market entry, including benchmarking of eight market agents.

Scale90 MW / 270 MWh
MarketSpain
Case Study
M&A / TDD2022
MET Group logo
Transaction advisory on a 220 MW hybrid project, Portugal

Transaction advisory on a 220 MW hybrid project, Portugal

Technical assessment of the portfolio and support to the buyer through the transaction process.

Scale220 MW
MarketPortugal
Case Study
Advisory2022
WElink logo
Hybridisation feasibility for a 150 MW PV project, Portugal

Hybridisation feasibility for a 150 MW PV project, Portugal

Feasibility of PV repowering, wind integration and storage addition on an operating asset.

Scale150 MW / 600 MWh
MarketPortugal
Case Study
M&A / TDD2025
Ric Energy logo
Sponsor's technical advisor on the project finance of a 390 MW / 1.5 GWh hybrid portfolio, Spain

Sponsor's technical advisor on the project finance of a 390 MW / 1.5 GWh hybrid portfolio, Spain

Benchmarking of the different consultants' results and stress-testing of market scenarios to support the negotiations with lenders and offtakers.

Scale390 MW / 1,500 MWh
MarketSpain
Case Study
Advisory2022
BayWa r.e. logo
Hybridisation feasibility for a 113 MWp PV project, Spain

Hybridisation feasibility for a 113 MWp PV project, Spain

Portfolio-level techno-economic and regulatory feasibility underpinning the client's BESS strategy.

Scale100 MW / 400 MWh
MarketSpain
Case Study
Grants2025
MET Group logo
Subsidy applications for a 44 MW / 160 MWh storage project, Spain

Subsidy applications for a 44 MW / 160 MWh storage project, Spain

Grant strategy and application documentation for the storage project.

Scale44 MW / 160 MWh
MarketSpain
Case Study
M&A / TDD2025
Sky Renewables logo
Transaction TDD on two BESS projects (30 MW and 60 MW), Spain

Transaction TDD on two BESS projects (30 MW and 60 MW), Spain

Technical restrictions analysis, ancillary-services revenue forecasts (aFRR, mFRR, RR) and market-representative assessment.

Scale30 + 60 MW BESS
MarketSpain
Case Study
Advisory2024
Trina Solar logo
Spanish storage strategy for a global IPP: 20 MW / 80 MWh hybridisation

Spanish storage strategy for a global IPP: 20 MW / 80 MWh hybridisation

Regulatory framework review, dispatch and price-taker revenue modelling, plant sizing and basic engineering for the grid-access update.

Scale20 MW / 80 MWh
MarketSpain
Case Study
M&A / TDD2025
Octopus Energy logo
Rolling TDD programme across seven PV acquisitions (24–62 MW each), Spain

Rolling TDD programme across seven PV acquisitions (24–62 MW each), Spain

Standardised due diligence pipeline: technical review, independent yield, permitting and grid status, delivered asset by asset to acquisition deadlines.

Scale300+ MWp screened
MarketSpain
Case Study
Advisory2020
OPDE logo
Hybrid PV + BESS sizing for a 99.8 MWp project, Nottinghamshire (UK)

Hybrid PV + BESS sizing for a 99.8 MWp project, Nottinghamshire (UK)

BESS modelling of hybrid scenarios against grid curtailment, market price analysis and CAPEX/OPEX financial model.

Scale99.8 MWp + 60 MW / 120 MWh
MarketUnited Kingdom
Case Study
M&A / TDD2024
Jetion Solar logo
TDD for the acquisition of a 100 MW ready-to-build PV pipeline, Spain

TDD for the acquisition of a 100 MW ready-to-build PV pipeline, Spain

Full technical due diligence on 2 × 50 MWp: design and equipment, yield, EPC cost, grid connection, permitting and environmental status.

Scale100 MW · two plants
MarketSpain
Case Study
M&A / TDD2022
MET Group logo
Technical due diligence on a 115 MW PV project, Italy

Technical due diligence on a 115 MW PV project, Italy

Independent technical review of the PV assets for the buyer during the origination of the acquisition.

Scale115.3 MW
MarketItaly
Case Study
Advisory2024
Svea Solar logo
Engineering optimisation of a 107 MWp flagship solar project, Sweden

Engineering optimisation of a 107 MWp flagship solar project, Sweden

Review of design criteria, component selection and production estimates across the project.

Scale107 MWp
MarketSweden
Case Study
M&A / TDD2024
Fortis Energy logo
Red-flag TDD for a 50 MW PV acquisition, Andalusia

Red-flag TDD for a 50 MW PV acquisition, Andalusia

Fast-track red-flag review: technical status, yield, EPC cost estimate, grid, permitting, environmental and SPV ownership verification.

Scale49.99 MW
MarketSpain
Case Study
Asset Mgmt2021–2022
SEAT logo
Second-life strategy for prototype EV and PHEV batteries, Spain

Second-life strategy for prototype EV and PHEV batteries, Spain

Technical procedure for repurposing second-life batteries plus the commercial strategy and contractual terms for their resale.

Scale2 MW / 4 MWh
MarketSpain
Case Study
Advisory2020
OPDE logo
Curtailment mitigation with storage for a 42 MWp PV project, Grantham (UK)

Curtailment mitigation with storage for a 42 MWp PV project, Grantham (UK)

Hourly energy profiles, full market price analysis, BESS technical definition and chemistries, supplier review and financial model with sensitivities.

Scale42 MWp
MarketUnited Kingdom
Case Study
Advisory2025–2026
Octopus Energy logo
Module procurement QA/QC strategy and repaneling study, United Kingdom

Module procurement QA/QC strategy and repaneling study, United Kingdom

Quality assurance specifications and metrics for module procurement (TOPCon, HJT, BC), plus a repaneling study assessing mechanical and electrical compatibility, cost and yield.

Scale10.5 MW
MarketUnited Kingdom
Case Study
M&A / TDD2023
MET Group logo
TDD and transaction advisory on an 80 MW PV portfolio, Italy

TDD and transaction advisory on an 80 MW PV portfolio, Italy

Independent technical due diligence of the Italian portfolio with transaction support for the investment committee.

Scale80 MW
MarketItaly
Case Study
M&A / TDD2023–2024
Fortis Energy logo
Project origination and transaction support for a 50 MW asset, Spain

Project origination and transaction support for a 50 MW asset, Spain

Origination of a 50 MW opportunity for an international IPP, with technical due diligence and deal structuring up to signing stage.

Scale50 MW
MarketSpain
Case Study
Advisory2025
Capital Dynamics logo
Hybridisation studies across four PV projects, SpainNo project photo

Hybridisation studies across four PV projects, Spain

Basic engineering, technical documentation and hybridisation feasibility with detailed cost assessment and a development roadmap.

Scale200 MW / 600 MWh
MarketSpain
Case Study
M&A / TDD2024
MET Group logo
TDD and equipment procurement for a 65 MW hybridisation project, Bulgaria

TDD and equipment procurement for a 65 MW hybridisation project, Bulgaria

Independent review of two competing BESS supplier proposals plus procurement advisory for EPC selection.

Scale65 MWp PV + 63 MWh BESS
MarketBulgaria
Case Study
Advisory2025
Sky Renewables logo
Hybridisation study for two PV projects (Mainland and Alba), Spain

Hybridisation study for two PV projects (Mainland and Alba), Spain

BESS sizing and swap simulation with project valuation across several hybrid configurations in One Hub Analytics.

ScalePV + BESS
MarketSpain
Case Study
Advisory2022–2023
Lightsource BP logo
Storage strategy for 25 MW and 100 MW BESS reference plants, SpainNo project photo

Storage strategy for 25 MW and 100 MW BESS reference plants, Spain

Techno-economic modelling and regulatory feasibility of both reference configurations.

Scale100 MW / 400 MWh
MarketSpain / United Kingdom
Case Study
M&A / TDD2024
MET Group logo
TDD on two PV assets under construction (65 MW and 50 MW), Spain

TDD on two PV assets under construction (65 MW and 50 MW), Spain

Construction-stage technical due diligence and transaction support on both assets.

Scale65 + 50 MWp
MarketSpain
Case Study
Development2022–2024
APD logo
572.8 kWp industrial self-consumption plant, Spain

572.8 kWp industrial self-consumption plant, Spain

Feasibility and hourly energy modelling, EPC tender management, engineering, construction management and development through to ready-to-build.

Scale572.8 kWp · 781.2 MWh/yr
MarketSpain
Case Study
Grants2025
Capital Dynamics logo
FEDER auction applications for a 236 MW storage portfolio, SpainNo project photo

FEDER auction applications for a 236 MW storage portfolio, Spain

Basic engineering documentation for the full portfolio and four projects submitted to the FEDER auction.

Scale236 MW / 508 MWh
MarketSpain
Case Study
Development2024
Sonnedix logo
BESS procurement and O&M framework for a 65 MW / 260 MWh project, PortugalNo project photo

BESS procurement and O&M framework for a 65 MW / 260 MWh project, Portugal

EMS and O&M strategy review, technical and commercial assessment of shortlisted BESS manufacturers, LTSA negotiation support and QA/QC review.

Scale65 MW / 260 MWh
MarketPortugal
Case Study
Advisory2024–2025
WElink logo
Hybridisation development for a 200 MW PV project, SpainNo project photo

Hybridisation development for a 200 MW PV project, Spain

Technical services to plan the storage integration of an operating PV portfolio.

Scale200 MW / 600 MWh
MarketSpain
Case Study
Asset Mgmt2024–2025
Octopus Energy logo
Ancillary-services revenue forecasting for a PV portfolio, Spain

Ancillary-services revenue forecasting for a PV portfolio, Spain

Operating strategy and balancing-market dynamics analysis with medium-term price forecasts for balancing services.

ScaleBalancing markets
MarketSpain
Case Study
Advisory2024
L'Energètica logo
Site screening and technical office for a standalone BESS programme, Spain

Site screening and technical office for a standalone BESS programme, Spain

300+ sites evaluated and ranked, with the technical office issuing all documentation for guarantees and grid-access applications.

Scale100 MW / 250 MWh
MarketSpain
Case Study
Advisory2024
Capital Dynamics logo
Hybridisation of a 115 MWp PV project, AndalusiaNo project photo

Hybridisation of a 115 MWp PV project, Andalusia

Technology report, regulatory report with development planning, techno-economic valuation and optimal sizing.

Scale120 MW / 360 MWh
MarketSpain
Case Study
M&A / TDD2020–2025
EnerQuantum logo
Buy-side technical advisory and origination support for a 500 MW BESS portfolio, SpainNo project photo

Buy-side technical advisory and origination support for a 500 MW BESS portfolio, Spain

Market assessment study, buy-side valuation and NBO preparation support, together with strategic guidelines and identification of M&A opportunities for the portfolio.

Scale500 MW BESS portfolio
MarketSpain
Case Study
Advisory2023
Covestro logo
Advisory on a 100-150 GWh/year baseload corporate PPA and 4.7 MW on-site generation for an industrial site in Tarragona, SpainNo project photo

Advisory on a 100-150 GWh/year baseload corporate PPA and 4.7 MW on-site generation for an industrial site in Tarragona, Spain

PPA strategy and Spanish market analysis, RFQ design and execution, shortlisting of 10-12 suppliers and term-sheet negotiation support, plus the tender of an on-site PV + BESS solution.

Scale4.7 MW on-site PV / 100-150 GWh per year PPA
MarketSpain
Case Study
Advisory2023
Green Tie logo
Hybridisation feasibility for a 19.6 MW PV plant, Huelva

Hybridisation feasibility for a 19.6 MW PV plant, Huelva

Regulatory review, development plan and techno-economic case for adding storage to an operating asset.

Scale19.6 MWn PV + 20 MW / 80 MWh
MarketSpain
Case Study
Advisory2024
NEP logo
Design optimisation and technical validation for a 70 MWp project, Kent (UK)

Design optimisation and technical validation for a 70 MWp project, Kent (UK)

Layout and single-line diagram review, component evaluation and independent production validation.

Scale70 MWp
MarketUnited Kingdom
Case Study
Development2021–2025
Casona de Labrada logo
Self-consumption with full backup for a hotel on a weak grid, Galicia

Self-consumption with full backup for a hotel on a weak grid, Galicia

Self-consumption study, BESS sizing, detailed engineering, legalisation and regional grant application.

Scale18.2 kWp / 14.4 kWh
MarketSpain
Case Study
Development2022
MET Group logo
Development services for a 20 MW PV project, Spain

Development services for a 20 MW PV project, Spain

Development management across permitting, grid access and project documentation.

Scale20 MW
MarketSpain
Case Study
Advisory2025
ORIT logo
Repowering feasibility and PV module compatibility assessment for a 123 MW, 8-site portfolio, United KingdomNo project photo

Repowering feasibility and PV module compatibility assessment for a 123 MW, 8-site portfolio, United Kingdom

Energy yield assessment comparing repowering scenarios with high-level CAPEX and construction-impact analysis per scenario, plus a deviation assessment of the incumbent module type versus like-for-like replacement, identifying the sites where the designated module was compatible for repaneling.

Scale8-site portfolio · 123 MW
MarketUnited Kingdom
Case Study
Advisory2024
Avintia logo
Hybridisation feasibility for a 10.5 MWp PV asset, Valladolid

Hybridisation feasibility for a 10.5 MWp PV asset, Valladolid

Techno-economic modelling and regulatory assessment of storage integration.

Scale10.5 MWp / 30 MWh
MarketSpain
Case Study
M&A / TDD2021
Econergy logo
TDD for a 49.97 MW PV acquisition, Valencia RegionNo project photo

TDD for a 49.97 MW PV acquisition, Valencia Region

Documentation review, desktop site assessment, design analysis, yield modelling, land and grid review with acquisition conclusions.

Scale49.97 MW
MarketSpain
Case Study
Advisory2024
Capital Dynamics logo
Bankable hybridisation study for a ~200 MW PV portfolio, SpainNo project photo

Bankable hybridisation study for a ~200 MW PV portfolio, Spain

High/medium/low revenue scenarios on One Hub Energy curves, digital twin to compare configurations and IRR/NPV model with sensitivities for the investment committee.

Scale~200 MW
MarketSpain
Case Study
Advisory2025
Fomento logo
Solar-plus-storage self-consumption for agricultural irrigation, Côte d'Ivoire

Solar-plus-storage self-consumption for agricultural irrigation, Côte d'Ivoire

Pre-feasibility of a 6 MWp PV + 10 MWh BESS self-consumption system for agricultural irrigation.

Scale6 MWp / 10 MWh
MarketCôte d'Ivoire
Case Study
Development2022–2024
WElink logo
Technical studies and hybridisation of the Solara4 solar project, SpainNo project photo

Technical studies and hybridisation of the Solara4 solar project, Spain

Grid connection studies, basic engineering and production analysis, followed by the hybridisation services for the same asset.

Scale50 MW
MarketSpain
Case Study
Asset Mgmt2025
Octopus Energy logo
Market-representative benchmarking for a 90 MW PV portfolio, SpainNo project photo

Market-representative benchmarking for a 90 MW PV portfolio, Spain

Comparative assessment of market agents on historical operating data, contract terms and settlement performance.

Scale90 MW
MarketSpain
Case Study
Asset Mgmt2025
Sky Renewables logo
Guarantees of Origin advisory for a 90 MW PV portfolio, SpainNo project photo

Guarantees of Origin advisory for a 90 MW PV portfolio, Spain

Ongoing consultancy on Guarantees of Origin across the client's Spanish PV assets.

Scale90 MW PV portfolio
MarketSpain
M&A / TDD2025
EnerQuantum logo
Red flag due diligence for a 62.6 MW / 250.4 MWh BESS acquisition under an M&A framework agreement, SpainNo project photo

Red flag due diligence for a 62.6 MW / 250.4 MWh BESS acquisition under an M&A framework agreement, Spain

Red flag due diligence report covering technical, permitting, environmental and financial risks, delivered under a framework agreement for origination and transaction advisory across PV and BESS portfolios in Iberia.

Scale62.6 MW / 250.4 MWh BESS
MarketSpain
M&A / TDD2022
WElink logo
Technical transaction advisory for a 300 MW PV pipeline, ItalyNo project photo

Technical transaction advisory for a 300 MW PV pipeline, Italy

Technical review of the pipeline assets and support throughout the M&A process.

Scale300 MW PV pipeline
MarketItaly
Development2023
Autoridad Portuaria de La Palma logo
Energy community on public port rooftops, La Palma

Energy community on public port rooftops, La Palma

Technical and economic feasibility, hourly modelling, basic engineering, investment structuring and member sharing coefficients.

Scale562 kWp
MarketSpain
Case Study
Development2023
Jetion Solar logo
Technical office and owner's engineering for a 32.49 MW PV and BESS project, SpainNo project photo

Technical office and owner's engineering for a 32.49 MW PV and BESS project, Spain

Technical office services supporting the owner across the project; mandate ongoing.

Scale32.49 MW
MarketSpain
Advisory2022
Ionity logo
BESS coupling for high-power EV charging stations, United Kingdom

BESS coupling for high-power EV charging stations, United Kingdom

Integration design and application process with DNOs, BESS suppliers and regulatory bodies.

Scale20 HPC · BESS coupling
MarketUnited Kingdom
Case Study
Advisory2023–2025
Truck Parking Network logo
EV charging infrastructure opportunity management across five European markets

EV charging infrastructure opportunity management across five European markets

Technical and commercial evaluation of 30+ CPO proposals for light-duty and heavy-duty charging, over 25 MW of aggregate deployment potential, with coordination of private competitive processes and negotiation with 15+ international operators.

Scale30+ CPO proposals · 5 markets
MarketSpain / Italy / France / Netherlands / Slovenia
Case Study
M&A / TDD2026
Octopus Energy logo
Red-flag technical and schedule review of a 49.9 MW PV asset, SpainNo project photo

Red-flag technical and schedule review of a 49.9 MW PV asset, Spain

Preliminary independent review of the technical design and the project schedule ahead of the investment decision.

Scale49.9 MW
MarketSpain
Case Study
Grants2025–2026
Altano logo
State-aid grant strategy for a 277 MW / 690 MWh storage project portfolio, SpainNo project photo

State-aid grant strategy for a 277 MW / 690 MWh storage project portfolio, Spain

Preparation and submission of FEDER applications for 10 projects, with basic engineering documentation, cost estimates and project valuation with One Hub Analytics, plus mapping and eligibility assessment of new subsidy schemes (REPOTEN-2, Orden TED/1444/2025).

Scale10 projects · 277 MW / 690 MWh
MarketSpain
Case Study
Grants2025
Ric Energy logo
IDAE grant application for a grid-forming BESS hybridisation, Carmona (Seville)No project photo

IDAE grant application for a grid-forming BESS hybridisation, Carmona (Seville)

Descriptive report and full application to the IDAE call (Order TED/535/2025) for a standalone grid-forming BESS hybridising an operating PV plant.

ScaleBESS hybridisation
MarketSpain
Case Study
Development2023
Covestro logo
On-site PPA generation for an industrial site, Catalonia

On-site PPA generation for an industrial site, Catalonia

Carport, ground-mount and rooftop generation options with hourly PV + BESS sizing.

ScaleOn-site PPA
MarketSpain
Case Study
Development2023
Cadaqués Directorship logo
Development directorship for the 148 MW / 296.75 MWh La Farga BESS, SpainNo project photo

Development directorship for the 148 MW / 296.75 MWh La Farga BESS, Spain

Management of the land option and lease and of the grid access and connection process, advancing the project through development.

Scale148 MW / 296.75 MWh BESS
MarketSpain
Case Study
M&A / TDD2024
Octopus Energy logo
Technical due diligence for a 39.75 MW operating PV acquisition, SpainNo project photo

Technical due diligence for a 39.75 MW operating PV acquisition, Spain

Independent verification of the seller's technical due diligence reports, with technical and commercial review and historical generation analysis.

Scale39.75 MW
MarketSpain
Case Study
Development2022
Sargao Energy logo
Development and technical advisory for a 107.91 MW / 215.824 MWh BESS project in Picassent, SpainNo project photo

Development and technical advisory for a 107.91 MW / 215.824 MWh BESS project in Picassent, Spain

Feasibility analysis, storage sizing and regulatory review delivered alongside project development, with administrative milestones logged (AA 2024-09, DIA 2025-03, AAP 2026-03) and the project in active development.

Scale107.91 MW / 215.824 MWh BESS
MarketSpain
Case Study
Development2023
Svea Solar logo
EPC and Owner's Engineer advisory for the Fjällskär 2 wind farm, SwedenNo project photo

EPC and Owner's Engineer advisory for the Fjällskär 2 wind farm, Sweden

EPC advisory and Owner's Engineer services delivered for the wind farm project.

ScaleWind farm EPC & Owner's Engineer advisory
MarketSweden
Case Study
Advisory2025-2026
Viners logo
Repowering and repaneling feasibility for a 9-site operating PV portfolio, United KingdomNo project photo

Repowering and repaneling feasibility for a 9-site operating PV portfolio, United Kingdom

Module compatibility assessment against the existing plant design and a repaneling report with module proposal, mechanical and electrical compatibility, cost and yield analysis, plus site-by-site repowering economics reviewed against the existing Phase-2 due diligence reports.

Scale9 sites / 162.67 MW
MarketUnited Kingdom
Case Study
Asset Mgmt2025
Elysia logo
Inverter health and O&M liability assessment across a 120 MW operating PV portfolio, FranceNo project photo

Inverter health and O&M liability assessment across a 120 MW operating PV portfolio, France

Desktop review technical report on 68 central inverters of a single family across 7 sites, assessing component health, maintenance practices and potential value recovery.

Scale120 MW · 68 inverters · 7 sites
MarketFrance
Case Study
M&A / TDD2023
MET Group logo
Technical due diligence for the acquisition of a 147.32 MWp PV portfolio (three plants), SpainNo project photo

Technical due diligence for the acquisition of a 147.32 MWp PV portfolio (three plants), Spain

Plant-by-plant due diligence across the 65 MW, 49.9 MW and 32.3 MW assets — permitting, grid connection, land, technology, plant and evacuation design, environmental impact and energy yield — consolidated into the portfolio TDD report.

Scale147.32 MWp · 3 plants
MarketSpain
Case Study
Advisory2025
Exiom logo
Storage hybridisation pre-feasibility and BESS advisory for a PV portfolio, SpainNo project photo

Storage hybridisation pre-feasibility and BESS advisory for a PV portfolio, Spain

Production, cost and long-term revenue and return modelling with sensitivities on demand access permits, market participation policies and PV-BESS sizing ratios, extended to a dedicated 10 MW site study.

Scale20 MW / 80 MWh portfolio study + 10 MW / 35 MWh site
MarketSpain
Case Study
Advisory2026
Reden logo
EPC and grid procurement advisory for a 56 MW agrivoltaic plant, ItalyNo project photo

EPC and grid procurement advisory for a 56 MW agrivoltaic plant, Italy

Technical, commercial and economic comparison report of the proposals received for the PV plant EPC services and the grid interconnection.

Scale56 MW agrivoltaic (AgroPV)
MarketItaly
Case Study
Advisory2023
MET Group logo
Techno-economic and regulatory assessment of a BESS project, AndalusiaNo project photo

Techno-economic and regulatory assessment of a BESS project, Andalusia

Storage valuation and regulatory analysis supporting the client's investment decision.

Scale44 MW / 90 MWh
MarketSpain
Case Study
Advisory2025
Fomento logo
Pre-feasibility of a PV + BESS self-consumption project, KenyaNo project photo

Pre-feasibility of a PV + BESS self-consumption project, Kenya

Pre-feasibility study for a 25 MWp self-consumption PV plus storage scheme for a rail operator.

Scale25 MWp
MarketKenya
Case Study
M&A / TDD2024
Grupo Satocan logo
M&A technical advisory for a PV asset transaction, SpainNo project photo

M&A technical advisory for a PV asset transaction, Spain

Preliminary technical proposal and investment teaser prepared to support the transaction and subsequent construction of the PV assets.

Scale4.4 MW PV asset
MarketSpain
Case Study
Asset Mgmt2023
MET Group logo
Technical asset management for Puerto Real III, a 50 MWp PV plant with 44 MW / 90 MWh BESS, SpainNo project photo

Technical asset management for Puerto Real III, a 50 MWp PV plant with 44 MW / 90 MWh BESS, Spain

Technical asset management services covering the PV plant and its battery storage system.

Scale50 MWp / 44 MWn PV + 44 MW / 90 MWh BESS
MarketSpain
Case Study
Asset Mgmt2024
Comunidad Energética El Rosario logo
Custom EMS for a 2.09 MWp collective self-consumption scheme with 1 MWh storage, SpainNo project photo

Custom EMS for a 2.09 MWp collective self-consumption scheme with 1 MWh storage, Spain

Developed a behind-the-meter price optimiser that automatically dispatches charge/discharge setpoints to the project's batteries from two different manufacturers based on electricity market prices, across 18 buildings.

Scale2.09 MWp PV + 1 MWh BESS · 18 buildings
MarketSpain
Case Study
M&A / TDD2025
Exiom logo
M&A advisory for a 46 MW PV and BESS pipeline in Murcia–Alicante, SpainNo project photo

M&A advisory for a 46 MW PV and BESS pipeline in Murcia–Alicante, Spain

Transaction advisory on the pipeline, including a valuation model for the Molina de Segura project (10.8 MW).

Scale46 MW pipeline
MarketSpain
Advisory2022
Alternus Energy logo
Independent technical advisory on a solar PV development portfolio, Spain and PortugalNo project photo

Independent technical advisory on a solar PV development portfolio, Spain and Portugal

Independent technical advisory reports on the client's PV development portfolio across both markets.

Scale6.49 MWp development portfolio
MarketSpain / Portugal
Grants2022
Eurecat logo
Coordination of a publicly funded collaborative R&D project on BESS market optimisation, SpainNo project photo

Coordination of a publicly funded collaborative R&D project on BESS market optimisation, Spain

Defined the platform's value proposition and cost/service models for BESS project evaluation, and coordinated DiÓptiBa, developing charge/discharge optimisation driven by market prices combined with AI-based forecasting.

ScaleCollaborative R&D project / BESS market optimisation platform
MarketSpain
Case Study
Development2022
BatteryLoop logo
Development and advisory for a 5 MW behind-the-meter BESS project, SpainNo project photo

Development and advisory for a 5 MW behind-the-meter BESS project, Spain

Development services and battery storage advisory delivered for the behind-the-meter asset.

Scale5 MW BTM BESS
MarketSpain
Advisory2022–2023
MET Group logo
PV+BESS hybridisation study and grid access update for the Puerto Real III plant, SpainNo project photo

PV+BESS hybridisation study and grid access update for the Puerto Real III plant, Spain

Assessment of adding BESS to the existing solar PV plant, followed by a preliminary grid access & connection report defining the modification scope and the single-line diagram.

Scale50 MWp / 44 MWn PV + 44 MW / 90 MWh BESS
MarketSpain
Case Study
Advisory2021
Ayuntamiento de Canyelles logo
Municipal PV self-consumption plan and energy community for 10 public sites, SpainNo project photo

Municipal PV self-consumption plan and energy community for 10 public sites, Spain

Assessment of ten municipal sites totalling 750 kWp, energy community structuring for 130-260 members, financing and treasury model, production simulations and PV carport procurement, with the grant applications submitted under RD 477/2021.

Scale10 sites · 750 kWp
MarketSpain
Development2023
Tratamientos Térmicos Granollers logo
Development of a 116 kWp self-consumption PV plant with surplus, from feasibility to ready-to-build, SpainNo project photo

Development of a 116 kWp self-consumption PV plant with surplus, from feasibility to ready-to-build, Spain

Feasibility and design of generation and BESS solutions, EPC tendering, grid access permitting and site supervision for quality and safety.

Scale116 kWp
MarketSpain
Development2022-2023
Prytanis logo
Rooftop self-consumption PV and storage development for residences in Barcelona, SpainNo project photo

Rooftop self-consumption PV and storage development for residences in Barcelona, Spain

Technical and feasibility reports, tendering of generation and BESS solutions, development through to ready-to-build for self-consumption with surplus, and site supervision for quality and safety.

Scale0.076 MW rooftop PV
MarketSpain
Advisory2021
Corgrap logo
Self-consumption assessment for a 0.049 MW hybrid generation and storage installation, SpainNo project photo

Self-consumption assessment for a 0.049 MW hybrid generation and storage installation, Spain

Consumption analysis and self-consumption feasibility study, with the associated engineering services.

Scale0.049 MW · 0.025 MWh
MarketSpain
Advisory2026
Solar360 logo
Advisory on behind-the-meter business models with renewables and storage for a C&I partnership, SpainNo project photo

Advisory on behind-the-meter business models with renewables and storage for a C&I partnership, Spain

Assessment of new BTM business models and of the optimal BESS/hybrid configuration for the partnership.

ScaleBehind-the-meter PV + BESS business model study
MarketSpain
Development2022
SER Energia logo
Co-development of a storage project, BrazilNo project photo

Co-development of a storage project, Brazil

Phase 1 of the co-development programme: use cases, basic engineering and cost estimation.

ScaleCo-development, phase 1
MarketBrazil
Advisory2023
Sinne Energy logo
BESS advisory for a storage project at the Port of Bilbao, SpainNo project photo

BESS advisory for a storage project at the Port of Bilbao, Spain

Technical advisory on the battery storage scheme for the project.

ScaleBESS advisory mandate
MarketSpain
Advisory2023–2026
Padrosa logo
Self-consumption and heavy-duty EV charging advisory for a site owner, SpainNo project photo

Self-consumption and heavy-duty EV charging advisory for a site owner, Spain

Solar self-consumption and energy consultancy for the Padrosa site, plus technical advisory for the development of a BP heavy-duty EV charging station under a lease/charging arrangement.

Scale2 advisory mandates · PV self-consumption + EV charging
MarketSpain
Advisory2021
Bodegas Colet logo
Self-consumption feasibility study for a winery in the Penedès, SpainNo project photo

Self-consumption feasibility study for a winery in the Penedès, Spain

PV + BESS sizing scenarios assessed against the winery's consumption profile.

ScalePV + BESS self-consumption sizing study
MarketSpain
Advisory2022
Obton logo
Technical and economic pre-feasibility study for a PV project, SpainNo project photo

Technical and economic pre-feasibility study for a PV project, Spain

Pre-feasibility report covering the technical and economic assessment of the project, delivered to the client.

ScalePre-feasibility report
MarketSpain
Advisory2022
Hosbec logo
Self-consumption PV advisory for a hotel association in the Valencia region, SpainNo project photo

Self-consumption PV advisory for a hotel association in the Valencia region, Spain

Assessment of PV opportunities across member hotels, collecting supply points and sizing the available potential.

ScalePV potential assessment across member hotels
MarketSpain
Advisory2022
Institute for Environmental Analytics logo
Advisory on environmental and energy data analytics for renewables, United KingdomNo project photo

Advisory on environmental and energy data analytics for renewables, United Kingdom

Collaboration with the institute applying data analytics to renewable energy assets.

ScaleEnvironmental & energy data analytics advisory
MarketUnited Kingdom
Advisory2022
Tenerife Espacio de las Artes logo
Rooftop self-consumption and storage study for a cultural facility, Canary IslandsNo project photo

Rooftop self-consumption and storage study for a cultural facility, Canary Islands

Preliminary self-consumption study with a ballasted rooftop layout, the case for adding storage, and the performance and cost of the installation.

ScaleRooftop PV + storage study
MarketSpain
M&A / TDD2022–2023
MET Group logo
Buy-side due diligence for the acquisition of the 49.99 MWp Puerto Real III PV plant, SpainNo project photo

Buy-side due diligence for the acquisition of the 49.99 MWp Puerto Real III PV plant, Spain

Technical due diligence on the plant delivered in Q1 2022, extended into buy-side M&A advisory for the acquisition process.

Scale49.99 MWp
MarketSpain
Case Study
Development2023
MET Group logo
EPC contracting advisory and construction supervision for a 49.9 MW PV plant, AndalusiaNo project photo

EPC contracting advisory and construction supervision for a 49.9 MW PV plant, Andalusia

Plant and substation EPC tender run end to end, with quality control and site supervision during construction.

Scale49.9 MW
MarketSpain
Case Study
Advisory2023
MET Group logo
Techno-economic and regulatory assessment of a 45 MW / 157.5 MWh BESS project in Madrid, SpainNo project photo

Techno-economic and regulatory assessment of a 45 MW / 157.5 MWh BESS project in Madrid, Spain

Techno-economic modelling and regulatory review delivered to support the client's investment decision.

Scale45 MW / 157.5 MWh BESS
MarketSpain
M&A / TDD2023
MET Group logo
Preliminary technical and economic screening of five PV origination opportunities, SpainNo project photo

Preliminary technical and economic screening of five PV origination opportunities, Spain

Preliminary technical and economic analysis of five PV projects ranging from 0.996 MW to 49.9 MW, presented to the client for origination purposes.

Scale5 PV projects · 0.996–49.9 MW
MarketSpain
Advisory2023
MET Group logo
Technical advisory on the Vale da Missa solar PV plant, PortugalNo project photo

Technical advisory on the Vale da Missa solar PV plant, Portugal

Advisory support to MET Green Assets Holding covering the CSF de Vale da Missa solar PV asset.

ScaleTechnical advisory · Vale da Missa PV plant
MarketPortugal
Confidential mandates15

Some clients do not authorise the use of their brand. These mandates are published without name, logo, photography or location: the technical scope and the scale are real and auditable, the identity is not disclosed.

Advisory2021–2023
Confidential Client
BESS origination strategy for a 300 MW pipeline, Spain

BESS origination strategy for a 300 MW pipeline, Spain

Technical and commercial roadmap to build out a standalone storage pipeline.

Scale300 MW / 600 MWh
MarketSpain
Case Study
Development2023
Confidential Client
300 kW rooftop PV revamping under a specific remuneration scheme, Spain

300 kW rooftop PV revamping under a specific remuneration scheme, Spain

Feasibility, grant management, permitting to RtB, engineering and construction supervision.

Scale300 kW · 360 MWh/yr
MarketSpain
Case Study
Grants2023
Confidential Client
PRTR grant strategy for a 75 MW hybridisation portfolio, Spain

PRTR grant strategy for a 75 MW hybridisation portfolio, Spain

Techno-economic studies for three 25 MW hybridisations and full preparation of the grant applications.

Scale75 MW / 150 MWh
MarketSpain
Case Study
Grants2024
Confidential Client
PRTR funding and basic engineering for a 150 MW / 4h BESS programme, Spain

PRTR funding and basic engineering for a 150 MW / 4h BESS programme, Spain

Basic engineering to convert 2h designs to 4h duration plus the full PRTR application package.

Scale150 MW / 600 MWh
MarketSpain
Grants2023
Confidential Client
Hybridisation services and IDAE grant application for a 300 MW / 600 MWh storage programme, Spain

Hybridisation services and IDAE grant application for a 300 MW / 600 MWh storage programme, Spain

Hybridisation support across the client's projects, plus preparation and submission of the economic aid application to IDAE for the BESS project.

Scale300 MW / 600 MWh
MarketSpain
Development2026
Confidential Client
Access and connection permit updates for the hybridisation of three PV plants with storage, Spain

Access and connection permit updates for the hybridisation of three PV plants with storage, Spain

Guarantees management through to correct constitution letters and processing of the access and connection permit updates with the transmission and distribution system operators for three PV-plus-storage hybridisations.

Scale3 hybridisation projects / 20.2-32.76 MW each
MarketSpain
Case Study
Grants2025
Confidential Client
FEDER state-aid grant applications for a 31.5 MW / 120 MWh PV + BESS project, Spain

FEDER state-aid grant applications for a 31.5 MW / 120 MWh PV + BESS project, Spain

Basic engineering documentation and the FEDER auction project request form, with the technical proposal optimised to the call's evaluation criteria.

Scale31.5 MW / 120 MWh
MarketSpain
Development2023–2025
Confidential Client
Solar community strategy and business model for 11 MWp of rooftop self-consumption

Solar community strategy and business model for 11 MWp of rooftop self-consumption

Business model, feasibility and permitting strategy for collective self-consumption on third-party rooftops.

Scale11 MWp · payback 7 yr
MarketSouthern Europe
Case Study
Development2024–2026
Confidential Client
Owner's engineering during construction of rooftop solar communities

Owner's engineering during construction of rooftop solar communities

Site supervision, quality and safety control, budget and schedule control through construction and legalisation.

Scale11 MWp
MarketSouthern Europe
Case Study
Grants2025
Confidential Client
Grant applications for a storage and hybridisation programme, Spain

Grant applications for a storage and hybridisation programme, Spain

Engineering and application documentation for storage and hybridisation subsidy calls.

Scale4 projects into the FEDER call
MarketSpain
Case Study
Advisory2021–2022
Confidential Client
Technical and regulatory advisory for a 1.95 MW / 3.89 MWh BESS project, northern Spain

Technical and regulatory advisory for a 1.95 MW / 3.89 MWh BESS project, northern Spain

Technical, economic and regulatory feasibility analysis of the storage system, followed by environmental permitting support.

Scale1.95 MW / 3.89 MWh
MarketSpain
Advisory2021–2023
Confidential Client
Energy transition plan and 171 kWp self-consumption installation for an agri-food processing group, Spain

Energy transition plan and 171 kWp self-consumption installation for an agri-food processing group, Spain

Feasibility study, permit management and engineering for a self-consumption plant with grid injection, preceded by an energy transition plan covering two consumption centres with 4.9 GWh annual electricity demand and supply contract optimisation.

Scale171 kWp self-consumption
MarketSpain
Development2021–2022
Confidential Client
Technical-economic study and EPC of a 35 kWp rooftop PV plus 35 kWh storage installation, Barcelona

Technical-economic study and EPC of a 35 kWp rooftop PV plus 35 kWh storage installation, Barcelona

Self-consumption feasibility study sized against the site's ~27 kW contracted demand and consumption profile, followed by procurement and EPC delivery of the PV+BESS hybridisation.

Scale35 kWp PV + 35 kWh BESS
MarketSpain
Advisory2021
Confidential Client
PV self-consumption studies for two buildings, Barcelona province, Spain

PV self-consumption studies for two buildings, Barcelona province, Spain

Solar PV self-consumption assessments delivered for a building and a commercial unit.

Scale2 PV self-consumption studies
MarketSpain
Development2023–2024
Confidential Client
Rooftop solar programme for a restricted industrial client: development, revamping and asset transfer

Rooftop solar programme for a restricted industrial client: development, revamping and asset transfer

Development of a multi-site collective self-consumption rollout through to grid access and connection permits, revamping engineering on two operating rooftop plants and the administrative transfer of an existing installation, run under a full confidentiality regime.

ScaleMulti-site rooftop rollout + revamping
MarketSouthern Europe
Built for lender review

Our outputs are structured for investment committees and lender due diligence.

Independence, analytical rigour and proprietary technology are not differentiators we advertise. They are the baseline our clients verify in every data room.

01

Structural independence

Independent of manufacturers, EPCs and funds: we hold no equity in the assets we assess and take no supplier commissions. Our only obligation is to the integrity of the investment case.

02

Financial models built for lender review

Revenue simulations, IRR/NPV validation and sensitivity analysis designed for lender due diligence and investment-committee review.

03

Institutional R&D backing

Backed by ENISA and by Spanish and EU innovation programmes under NextGenerationEU. ML forecasting co-developed with EURECAT.

Institutional backingEURECATCDTIENISANextGenerationEUIDAE

Asset performance
is documented, not claimed.

We operate under strict confidentiality. For specific credentials in your market or technology, let's open a direct channel.

One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy