Case ReportEVALUATE & INVEST

One Hub Energy advised

Fomento

Pre-feasibility study of a 25 MWp PV + BESS self-consumption scheme for railway substations in Kenya

Technical and economic pre-feasibility of a rooftop and ground-mounted PV + BESS self-consumption scheme serving the electrical substations of a railway infrastructure in Kenya, with hourly demand curve estimation, energy modelling and simulation for sizing, risk analysis and funding structuring.

01
Background

A set of electrical substations of a railway infrastructure in Kenya was to be supplied from self-consumption generation, which meant establishing the demand first and then the size of the PV and storage able to serve it.

02
Process

One Hub Energy carried out the technical and economic pre-feasibility study: estimation of the hourly demand curves, hourly energy modelling and simulation to size the PV + BESS solution — 500 kWp of rooftop PV with a 400 kWh battery and 20 MWp of ground-mounted PV with a 4 MWh battery — risk analysis, and the structuring and planning of the financing. A 7-year payback was considered.

03
Outcome

"The pre-feasibility study was delivered for the 25 MWp PV + BESS self-consumption scheme serving the railway substations in Kenya."

One Hub Energy VERIFIED RECORD
No project photo
KENYA
DOSSIER SPEC SHEETVERIFIED
Client EntityFomento
GeographyKenya
Capacity25 MWp
Date2025
Delivered to the client5 items
  • Technical and economic pre-feasibility study
  • Hourly demand curve estimation
  • Hourly energy modelling and simulation for PV + BESS sizing
  • Risk analysis
  • Financing structuring and planning
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-fomento-kenya-prefeasibility

Where this work sits

One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy