One Hub Energy advised
Fortis Energy
Red-flag technical due diligence for a 50 MW PV acquisition in Andalusia
Red-flag due diligence on a 50 MW PV acquisition, technical review, energy yield, EPC cost estimate, grid connection, permitting, environmental assessment and SPV ownership verification.
The buyer needed a fast, prioritised read on whether a 49.99 MW PV acquisition carried deal-breaking technical, permitting or ownership risk.
One Hub Energy ran a red-flag due diligence structured around project overview, technical review, energy production assessment, forecast PV plant EPC costs, interconnection assessment, permitting assessment, environmental assessment and verification of the SPV registration and ownership, closing with a summary of findings and conclusions that flagged the issues by materiality.
"The red-flag due diligence report was delivered for the 49.99 MW PV plant, covering technical, permitting, environmental and financial risks."

- Red-flag due diligence report
- Energy production assessment
- EPC cost estimate
- Permitting and environmental assessment
- SPV registration and ownership verification
Briefings require signing a bilateral NDA for full technical metrics disclosure.
Where this work sits
Linked Track Records & Case Studies

Independent technical due diligence for a 65 MW hybridisation project in Bulgaria

Independent technical due diligence across a 300+ MWp PV acquisition pipeline