One Hub Energy advised
Fomento
Pre-feasibility for a 6 MWp + 10 MWh solar-plus-storage irrigation system
Pre-feasibility study for a 6 MWp PV + 10 MWh BESS self-consumption system powering agricultural irrigation in Côte d'Ivoire.
Agricultural irrigation had to be powered reliably and cost-effectively in an off-grid context, where grid supply was not a dependable option.
One Hub Energy acted as technical advisor on the storage and self-consumption scope, running the technical and economic pre-feasibility of a 6 MWp PV plus 10 MWh BESS self-consumption system for irrigation purposes, including the sizing of the generation and storage configuration for off-grid operation.
"The pre-feasibility study was delivered for the 6 MWp PV + 10 MWh BESS self-consumption system serving irrigation."

- Technical and economic pre-feasibility report
- PV + BESS sizing
- Off-grid system configuration
Briefings require signing a bilateral NDA for full technical metrics disclosure.
Where this work sits
Linked Track Records & Case Studies

Bankable hybridisation feasibility for a 19.6 MW PV plant in Huelva
No project photoBESS origination strategy for a 300 MW pipeline in Spain

