Sourcing a 100-150 GWh/year baseload corporate PPA and a 4.7 MW on-site plant for Covestro's Tarragona site
One Hub Energy ran the full PPA sourcing process for Covestro's Tarragona production site, from market analysis and RFQ design to supplier shortlisting and term-sheet negotiation, and tendered an on-site PV + BESS solution under the same engagement.
Covestro needed to cover 100-150 GWh per year of baseload demand at its Tarragona production site with a corporate renewable PPA. A volume of that size in the Spanish market means comparing structures and counterparties that are not directly comparable on paper. In parallel, the site had room for on-site generation, which had to be assessed as part of the same supply decision rather than separately.
One Hub Energy defined the PPA strategy and analysed the Spanish market for the required baseload profile. It then designed and executed the RFQ, and identified and shortlisted 10-12 PPA suppliers against that strategy. One Hub Energy structured the term sheet and supported Covestro through the negotiation. Under the same engagement, One Hub Energy tendered an on-site PV generation solution for the industrial site, so the on-site option and the contracted supply were evaluated on a common basis.
"The optimal PPA partner was selected for the client's industrial facilities. The on-site generation solution (PV + BESS) was designed and tendered under the same mandate."
No project photo- PPA strategy and Spanish market analysis for a 100-150 GWh/year baseload profile
- RFQ design and execution
- Identification and shortlist of 10-12 PPA suppliers
- Term-sheet structuring and negotiation support
- Design and tender of the 4.7 MW on-site PV + BESS solution
- Selection of the PPA partner for the industrial facilities
Briefings require signing a bilateral NDA for full technical metrics disclosure.
Where this work sits
Linked Track Records & Case Studies

Bankable hybridisation feasibility for a 19.6 MW PV plant in Huelva
No project photoBESS origination strategy for a 300 MW pipeline in Spain