HomeTrack RecordTen storage projects into the FEDER auction, and the next round of schemes mapped
[ TRACK RECORD INDEX ]
VERIFIED RECORD
SpainLOCATION
277 MW / 690 MWh across 10 projectsCAPACITY
FEDER state-aid application preparation and submission; screening of new subsidy schemesSCOPE
2025–2026DATE
Case ReportDEVELOP & BUILD

One Hub Energy advised

Altano

Ten storage projects into the FEDER auction, and the next round of schemes mapped

Preparation and submission of Spanish FEDER state-aid applications for ten of Altano's storage projects totalling 277 MW / 690 MWh, with basic engineering and cost estimates for each, followed by an eligibility screening of newly opened subsidy schemes.

01
Background

Altano held a hybrid and storage project portfolio of 277 MW / 690 MWh and wanted to take it into Spain's FEDER state-aid call. Competitive calls of this kind are won or lost on documentation: each project has to arrive with engineering and costs consistent enough to be scored, and the submission has to be built against the call's evaluation criteria rather than against the developer's internal logic. Doing that for ten projects at once, to a fixed deadline, was the real constraint.

02
Process

One Hub Energy prepared and supported the submission of the FEDER state-aid grant applications for Altano's storage projects. For every project in the portfolio we produced basic engineering documentation and the associated cost estimates, and valued the projects using One Hub Analytics so the figures presented were built on a consistent modelling basis. The applications were then aligned to the call's evaluation criteria rather than assembled generically. In 2026 the mandate continued beyond FEDER: One Hub Energy identified and analysed newly opened Spanish subsidy schemes relevant to Altano — including the REPOTEN-2 repowering scheme and Orden TED/1444/2025 for standalone storage — and assessed their eligibility and fit against Altano's assets.

03
Outcome

"Basic engineering documentation, including cost estimates, was delivered for all projects in the portfolio, and ten projects were presented into the FEDER auction. The follow-on work left Altano with the new grant opportunities mapped and an eligibility assessment for each."

One Hub Energy VERIFIED RECORD
No project photo
SPAIN
DOSSIER SPEC SHEETVERIFIED
Client EntityAltano
GeographySpain
Capacity277 MW / 690 MWh across 10 projects
Date2025–2026
Delivered to the client6 items
  • Basic engineering documentation for all portfolio projects
  • Cost estimates per project
  • Project valuation with One Hub Analytics
  • FEDER state-aid applications aligned to the call's evaluation criteria, submitted for 10 projects
  • Mapping of newly opened Spanish subsidy schemes (REPOTEN-2, Orden TED/1444/2025)
  • Eligibility and fit assessment of those schemes against Altano's assets
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-altano-feder-state-aid-storage-portfolio

Where this work sits

One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy