Full technical due diligence for a 50 MW PV acquisition, documentation review, desktop site assessment, design analysis, energy-yield modelling, land and grid-connection review, permitting and conclusions.
The acquisition of a 49.97 MW PV project had to be assessed on the developer's documentation alone, with no operating history to fall back on.
One Hub Energy reviewed the project documentation and ran a desktop site assessment, a technical assessment of the project design and a solar resource and energy yield assessment. The scope covered a technical review of the preliminary land option, lease and purchase contracts — site area, connection infrastructure and accesses — a grid connection assessment based on the technical documents drafted by the developer during the connection application period, and a permitting, regulation and administrative process review summarising the applicable process and identifying project status. One Hub Energy drafted the full conclusions and recommendations and held direct interlocution with the developer to gather additional information and clarifications.
"A full technical due diligence report was delivered for the 49.97 MW PV acquisition, covering design, energy yield, land and grid connection."
No project photo- Technical due diligence report
- Solar resource and energy yield assessment
- Land contract technical review
- Grid connection assessment
- Permitting and regulatory status review
Briefings require signing a bilateral NDA for full technical metrics disclosure.
Where this work sits
Linked Track Records & Case Studies

Independent technical due diligence for a 65 MW hybridisation project in Bulgaria