HomeTrack RecordTechnical due diligence for a 50 MW PV acquisition
[ TRACK RECORD INDEX ]
VERIFIED RECORD
Valencia Region, SpainLOCATION
50 MWCAPACITY
2021DATE
Case ReportEVALUATE & INVEST

One Hub Energy advised

Econergy

Technical due diligence for a 50 MW PV acquisition

Full technical due diligence for a 50 MW PV acquisition, documentation review, desktop site assessment, design analysis, energy-yield modelling, land and grid-connection review, permitting and conclusions.

01
Background

The acquisition of a 49.97 MW PV project had to be assessed on the developer's documentation alone, with no operating history to fall back on.

02
Process

One Hub Energy reviewed the project documentation and ran a desktop site assessment, a technical assessment of the project design and a solar resource and energy yield assessment. The scope covered a technical review of the preliminary land option, lease and purchase contracts — site area, connection infrastructure and accesses — a grid connection assessment based on the technical documents drafted by the developer during the connection application period, and a permitting, regulation and administrative process review summarising the applicable process and identifying project status. One Hub Energy drafted the full conclusions and recommendations and held direct interlocution with the developer to gather additional information and clarifications.

03
Outcome

"A full technical due diligence report was delivered for the 49.97 MW PV acquisition, covering design, energy yield, land and grid connection."

One Hub Energy VERIFIED RECORD
No project photo
VALENCIA REGION, SPAIN
DOSSIER SPEC SHEETVERIFIED
Client EntityEconergy
GeographyValencia Region, Spain
Capacity50 MW
Date2021
Delivered to the client5 items
  • Technical due diligence report
  • Solar resource and energy yield assessment
  • Land contract technical review
  • Grid connection assessment
  • Permitting and regulatory status review
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-econergy-pv-tdd
One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy