HomeTrack RecordTechnical due diligence for a 100 MW ready-to-build PV pipeline
[ TRACK RECORD INDEX ]
VERIFIED RECORD
Castilla-La Mancha, SpainLOCATION
2 × 50 MWpCAPACITY
2024DATE
Case ReportEVALUATE & INVEST

One Hub Energy advised

Jetion Solar

Technical due diligence for a 100 MW ready-to-build PV pipeline

Full technical due diligence for the acquisition of a 100 MW (2 × 50 MWp) ready-to-build PV pipeline, design and equipment review, energy yield, EPC cost, grid connection, permitting status and environmental verification.

01
Background

The buyer was handed a seller-prepared technical due diligence for two ready-to-build plants and needed it independently verified before committing to the pipeline.

02
Process

One Hub Energy carried out a full verification of the seller's technical due diligence together with a detailed review of the Virtual Data Room, asset by asset. The final report covered project overview and risk categorisation, technical assessment of design and equipment including potential improvements, energy production analysis with a comparison between the TDD PVsyst, our own PVsyst and the operational data provided, EPC cost estimate, technical and economic assessment of the grid connection, permitting status (planning, grid access, land use), equipment warranties, environmental verification and overall conclusions and recommendations. One Hub Energy also prepared the project analysis Q&A and supported the client during discussions and meetings with the seller.

03
Outcome

"A full technical due diligence and verification of the seller's reports and Virtual Data Room was delivered for the 100 MW RTB PV pipeline, with Q&A support during negotiations."

One Hub Energy VERIFIED RECORD
Technical due diligence for a 100 MW ready-to-build PV pipeline
CASTILLA-LA MANCHA, SPAIN
DOSSIER SPEC SHEETVERIFIED
Client EntityJetion Solar
GeographyCastilla-La Mancha, Spain
Capacity2 × 50 MWp
Date2024
Delivered to the client5 items
  • TDD verification report per asset
  • Independent PVsyst yield comparison
  • EPC cost estimate
  • Grid connection and permitting review
  • Negotiation Q&A support
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-jetion-solar-tdd
One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy