One Hub Energy advised
Confidential Client
FEDER grant applications for a 100 MW / 400 MWh storage pipeline
Preparation of the FEDER subsidy applications for the client's PV + BESS pipeline, each file backed by its own basic engineering documentation, building on an earlier hybridisation study and grant application support.
The developer had a PV + BESS pipeline to take to the FEDER auction and each file had to carry its own engineering basis.
One Hub Energy prepared the FEDER subsidy applications for the client's projects and produced the basic engineering documentation behind each file. The mandate followed earlier work for the same client: a hybridisation study of its PV + BESS projects in Spain and support in the corresponding grant applications.
This client does not authorise the use of its brand. The mandate is published without name, logo, photography or location: the technical scope and the scale are real and auditable, the identity is not disclosed.
"Every project in the pipeline received its basic engineering documentation, and four of the files went into the FEDER auction."
No project photo- FEDER subsidy applications
- Basic engineering documentation for each project
- Four project files submitted to the FEDER auction
- Hybridisation study for the PV + BESS projects
Briefings require signing a bilateral NDA for full technical metrics disclosure.
Where this work sits
Linked Track Records & Case Studies
No project photoPRTR grant strategy for a 75 MW hybridisation portfolio
No project photoFEDER grant applications for a 236 MW / 508 MWh storage portfolio

