HomeTrack RecordSelf-consumption PV with storage and full backup for a hotel on an unreliable grid
[ TRACK RECORD INDEX ]
VERIFIED RECORD
SpainLOCATION
18.24 kWp / 14.4 kWhCAPACITY
Self-consumption PV + BESS · 33 kW diesel backupSCOPE
2021–2025DATE
Case ReportDEVELOP & BUILD

One Hub Energy advised

Casona de Labrada

Self-consumption PV with storage and full backup for a hotel on an unreliable grid

Self-consumption study, BESS sizing and a three-phase 18.24 kWp + 14.4 kWh installation with full diesel backup, including detailed engineering, legalisation and the grant application.

01
Background

The hotel operated on a grid with low reliability and needed a self-consumption solution with backup able to keep the site running.

02
Process

One Hub Energy started with a PV self-consumption study sized against the site's contracted demand and consumption profile, followed by the BESS sizing for the commercial site with an evaluation of battery options and equipment configuration. The delivered solution is a three-phase self-consumption installation of 18.24 kWp with a 14.4 kWh lithium battery, three 3-phase-forming hybrid inverters and a 33 kW diesel generator as full backup. One Hub Energy also produced the detailed engineering, handled the legalisation and prepared the grant application to the Xunta de Galicia.

03
Outcome

"The three-phase self-consumption installation of 18.24 kWp + 14.4 kWh with full 33 kW diesel backup was delivered, including detailed engineering, legalisation and the grant application."

One Hub Energy VERIFIED RECORD
Self-consumption PV with storage and full backup for a hotel on an unreliable grid
SPAIN
DOSSIER SPEC SHEETVERIFIED
Client EntityCasona de Labrada
GeographySpain
Capacity18.24 kWp / 14.4 kWh
Date2021–2025
Delivered to the client5 items
  • PV self-consumption study
  • BESS sizing and equipment configuration
  • Detailed engineering package
  • Legalisation dossier
  • Grant application (Xunta de Galicia)
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-casona-de-labrada-offgrid
One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy