HomeTrack RecordBuy-side technical due diligence on the 147.32 MWp AUVEN PV portfolio, Spain
[ TRACK RECORD INDEX ]
VERIFIED RECORD
SpainLOCATION
147.32 MWp · 3 plantsCAPACITY
Technical due diligence (buy-side)SCOPE
2023DATE
Case ReportEVALUATE & INVEST

One Hub Energy advised

MET Group

Buy-side technical due diligence on the 147.32 MWp AUVEN PV portfolio, Spain

Independent technical, construction and contractual review of three Spanish PV plants totalling 147.32 MWp, assessed asset by asset and consolidated into a single TDD report for the acquiring party.

01
Background

MET Group was assessing the acquisition of the AUVEN PV portfolio in Spain: 147.32 MWp spread across three separate plants. A portfolio assembled from independently developed projects does not carry a single technical history — permitting, land, grid connection and design decisions differ site by site. The buyer needed an independent read of the technical, construction and contractual condition of each asset before committing.

02
Process

One Hub Energy acted as independent technical adviser to the buyer. Each asset was reviewed on its own terms: Bluesol 1 & 2 (65 MW), Berberana 1 (49.9 MW) and Censequero 1 (32.3 MWp, Agoncillo, La Rioja). Per site, the review covered permitting, grid connection, land plots, technology, plant and evacuation design, environmental impacts and energy yield. The technical package was examined together with the construction and contractual documentation of the portfolio. Site-level findings were then consolidated into a single portfolio view so that issues remained traceable to the asset that generated them.

03
Outcome

"A full technical due diligence report on the 147.32 MWp portfolio was delivered to MET. It supported the client's investment decision in the acquisition process, with each of the three plants documented individually."

One Hub Energy VERIFIED RECORD
No project photo
SPAIN
DOSSIER SPEC SHEETVERIFIED
Client EntityMET Group
GeographySpain
Capacity147.32 MWp · 3 plants
Date2023
Delivered to the client6 items
  • Consolidated technical due diligence report covering the 147.32 MWp portfolio
  • Asset-level technical reviews: Bluesol 1 & 2, Berberana 1, Censequero 1
  • Permitting, land plot and grid connection assessment per site
  • Plant and evacuation design review
  • Energy yield assessment
  • Construction and contractual documentation review
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-met-auven-portfolio-tdd
One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy