One Hub Energy advised
Capital Dynamics
Techno-economic and regulatory assessment of the hybridisation of a 115 MWp PV project in Andalusia
Techno-economic modelling and regulatory assessment of the hybridisation of a 115 MWp PV project, closed out with a technology report, a regulatory report with the development planning, and the valuation with the optimal sizing.
The owner had to settle, on both a technical and a regulatory basis, how a 115 MWp PV project in Andalusia should be hybridised and at what size.
One Hub Energy ran the techno-economic modelling and the regulatory assessment of the hybridisation of the 115 MWp PV project in Andalusia, covering the technology options, the regulatory framework and the development planning, and produced the techno-economic valuation together with the optimal sizing.
"A technology report, a regulatory report with the development planning, and the techno-economic valuation with the optimal sizing were delivered."
No project photo- Technology report
- Regulatory report and development planning
- Techno-economic valuation
- Optimal sizing
Briefings require signing a bilateral NDA for full technical metrics disclosure.