IDAE grant application for the BESS hybridisation of the GREENCAR 3 PV plant
Descriptive report and application to the IDAE call under Order TED/535/2025 for the BESS hybridisation of the GREENCAR 3 PV plant in Carmona (Seville), with shared evacuation at the 400 kV Carmona substation and a standalone grid-forming battery.
The GREENCAR 3 PV plant was to be hybridised with a standalone grid-forming battery sharing its evacuation at the 400 kV Carmona substation, and the application to the IDAE call had to be built while the power and the capacity of the battery were still to be defined.
One Hub Energy prepared the descriptive report (memoria descriptiva) and the application to the IDAE call under Order TED/535/2025 for the BESS hybridisation of the GREENCAR 3 PV plant in Carmona (Seville), with joint evacuation at the 400 kV Carmona substation of the transmission operator and a standalone grid-forming battery. The power and capacity of the storage remain to be defined.
"The descriptive report was prepared for submission to the IDAE call under Order TED/535/2025."
No project photo- Descriptive report (memoria descriptiva)
- IDAE grant application (Order TED/535/2025)
Briefings require signing a bilateral NDA for full technical metrics disclosure.
Where this work sits
Linked Track Records & Case Studies
No project photoPRTR grant strategy for a 75 MW hybridisation portfolio
No project photoFEDER grant applications for a 236 MW / 508 MWh storage portfolio