One Hub Energy advised

Ric Energy

IDAE grant application for the BESS hybridisation of the GREENCAR 3 PV plant

Descriptive report and application to the IDAE call under Order TED/535/2025 for the BESS hybridisation of the GREENCAR 3 PV plant in Carmona (Seville), with shared evacuation at the 400 kV Carmona substation and a standalone grid-forming battery.

01
Background

The GREENCAR 3 PV plant was to be hybridised with a standalone grid-forming battery sharing its evacuation at the 400 kV Carmona substation, and the application to the IDAE call had to be built while the power and the capacity of the battery were still to be defined.

02
Process

One Hub Energy prepared the descriptive report (memoria descriptiva) and the application to the IDAE call under Order TED/535/2025 for the BESS hybridisation of the GREENCAR 3 PV plant in Carmona (Seville), with joint evacuation at the 400 kV Carmona substation of the transmission operator and a standalone grid-forming battery. The power and capacity of the storage remain to be defined.

03
Outcome

"The descriptive report was prepared for submission to the IDAE call under Order TED/535/2025."

One Hub Energy VERIFIED RECORD
No project photo
CARMONA, SEVILLE, SPAIN
DOSSIER SPEC SHEETVERIFIED
Client EntityRic Energy
GeographyCarmona, Seville, Spain
CapacityBESS hybridisation — power and capacity to be defined
Date2025
Delivered to the client2 items
  • Descriptive report (memoria descriptiva)
  • IDAE grant application (Order TED/535/2025)
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-ric-energy-greencar-idae-grant

Where this work sits

One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy