One Hub Energy advised
WElink
Hybridisation feasibility study for a 200 MW PV project in Portugal
Technical services to run the hybridisation feasibility study of a 200 MW PV project, covering PV repowering, wind turbine deployment and the addition of energy storage.
The client had to establish how much more value a 200 MW PV project could carry by combining repowering, wind and storage on the same connection.
One Hub Energy provided the technical services to run the hybridisation feasibility study of the 200 MW PV project, assessing three routes in parallel: PV repowering of the existing plant, the deployment of wind turbines, and the incorporation of energy storage.
"The hybridisation feasibility study was delivered for the 200 MW PV project, covering repowering, wind integration and storage options."

- Hybridisation feasibility study
- PV repowering assessment
- Wind integration assessment
- Storage integration options
Briefings require signing a bilateral NDA for full technical metrics disclosure.