Storage strategy for 25 MW and 100 MW BESS reference plants
Optimal energy storage strategy defined for 25 MW and 100 MW BESS reference plants, fully compliant with Spanish regulations.
The client needed a bankable, regulation-compliant storage configuration for its Spanish reference assets, both standalone and hybridised with PV.
One Hub Energy delivered a techno-economic and regulatory assessment of energy storage plants in both standalone and PV-hybridised configurations. The work combined regulatory and legal advisory to ensure compliance with current and forthcoming rules, project simulations of hybrid and standalone configurations to allow strategic optimisation, the design of tailored technical solutions for each configuration, and comprehensive financial analysis of economic viability. Techno-economic modelling and regulatory feasibility were run on the 25 MW and 100 MW BESS reference plants.
"An optimal energy storage strategy was defined for the 25 MW and 100 MW BESS reference plants, compliant with Spanish regulations."
No project photo- Regulatory and legal advisory note
- Standalone and hybrid configuration simulations
- Technical solution design
- Financial viability analysis
Briefings require signing a bilateral NDA for full technical metrics disclosure.
Where this work sits
Linked Track Records & Case Studies

Bankable hybridisation feasibility for a 19.6 MW PV plant in Huelva
No project photoBESS origination strategy for a 300 MW pipeline in Spain