One Hub Energy advised
MET Group
Technical due diligence and transaction advisory on two Spanish PV assets in construction phase
Technical due diligence and transaction advisory for the acquisition of the La Solana (65 MW) and Berberana (50 MW) PV assets, both at construction stage, taken.
MET had to qualify two PV assets already in construction phase — La Solana and Berberana — before committing to their acquisition.
One Hub Energy provided technical due diligence and transaction advisory on both assets at construction stage, supporting MET through the process.
"La Solana (65 MWp) and Berberana (50 MWp) were presented to MET with TDD and M&A support for the acquisition. The mandate ended before signing."

- Technical due diligence on both assets
- Transaction advisory support
Briefings require signing a bilateral NDA for full technical metrics disclosure.
Where this work sits
Linked Track Records & Case Studies

Independent technical due diligence for a 65 MW hybridisation project in Bulgaria

Independent technical due diligence across a 300+ MWp PV acquisition pipeline

