Revamping of a 300 kW rooftop PV installation under a specific remuneration scheme, including subsidies management, permitting to ready-to-build, engineering, commissioning and construction supervision.

01
Background

An ageing rooftop PV asset operating under a specific remuneration scheme had to be modernised without losing its regime, and public subsidies had to be captured.

02
Process

One Hub Energy acted as owner's engineer across the full revamping. We assessed the technical and economic feasibility of revamping the 300 kW rooftop installation under its specific remuneration scheme, managed the subsidy application and handled the permitting — including permit updates — through to ready-to-build. One Hub Energy then produced the basic and construction engineering, commissioned the main equipment and ran on-site monitoring and works management to hold the highest quality and safety criteria.

This client does not authorise the use of its brand. The mandate is published without name, logo, photography or location: the technical scope and the scale are real and auditable, the identity is not disclosed.

03
Outcome

"The 300 kW revamping was delivered from feasibility to commissioning, with subsidy application, permits and construction supervision, reaching 360 MWh/year of production and +42% of remunerable hours."

One Hub Energy VERIFIED RECORD
No project photo
SPAIN
DOSSIER SPEC SHEETVERIFIED
Client EntityConfidential Client
Client TypeIndustrial (C&I)
Asset ClassRooftop PV (revamping)
GeographySpain
Capacity300 kW
Date2023
Delivered to the client5 items
  • Revamping feasibility study
  • Subsidy application
  • Permit update dossier to RtB
  • Basic and construction engineering
  • Commissioning and site supervision reports
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-confidential-rooftop-revamping

Where this work sits

One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy