HomeTrack RecordDevelopment directorship for the 148 MW / 296.75 MWh La Farga BESS
[ TRACK RECORD INDEX ]
VERIFIED RECORD
SpainLOCATION
148 MW / 296.75 MWh BESSCAPACITY
Development directorship, land control and grid accessSCOPE
2023DATE
Case ReportDEVELOP & BUILD

One Hub Energy advised

Cadaqués Directorship

Development directorship for the 148 MW / 296.75 MWh La Farga BESS

One Hub Energy runs the development directorship of the La Farga standalone battery project in Spain, managing land control and the grid access and connection process while the project advances through development.

01
Background

La Farga is a standalone battery project of 148 MW / 296.75 MWh. At that scale the project only exists if two things hold: control of the land and a firm grid access and connection position. Both run on administrative timelines the owner does not control, which is what makes development directorship the critical function at this stage.

02
Process

One Hub Energy acts as development director for the project. It manages the land option and the subsequent lease, securing site control for the battery. It also manages the grid access and connection process end to end. The mandate is structured to move the project forward through its development phase, with the administrative track recorded against milestones: admission of the administrative procedure in January 2024, DIA in July 2025 and AAP in April 2026.

03
Outcome

"The land option and lease and the grid access and connection process are managed, and the project has advanced through development. The project is recorded as being in active development, so this is a live mandate rather than a closed one."

One Hub Energy VERIFIED RECORD
No project photo
SPAIN
DOSSIER SPEC SHEETVERIFIED
Client EntityCadaqués Directorship
GeographySpain
Capacity148 MW / 296.75 MWh BESS
Date2023
Delivered to the client4 items
  • Development directorship for the 148 MW / 296.75 MWh BESS
  • Management of the land option and lease
  • Management of the grid access and connection process
  • Tracking of the administrative milestone track (procedure admission, DIA, AAP)
Request Full Briefing

Briefings require signing a bilateral NDA for full technical metrics disclosure.

ONE HUB ENERGYonehubenergy.comCS-la-farga-bess-development-directorship

Where this work sits

One Hub Energy

Driving confident decisions in complex energy markets.

ONE HUB ENERGIA S.L.CIF B-01610229Parc Tecnològic Barcelona ActivaC/ Marie Curie 8-12 (Modules A201–A211) · 08042 Barcelona+34 931 215 343 · connect@onehub.energy
LinkedIn

© 2026 One Hub Energy. All rights reserved.

Backed by Octopus Energy Generation
Proyecto SNEO-20231420 subvencionado por el CDTI. Gobierno de España, Ministerio de Ciencia, Innovación y Universidades.Financiado por ENISAProyecto CPP2021-008632 financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR.

Proyecto SNEO-20231420 (OneFlex) subvencionado por el CDTI · Proyecto CPP2021-008632 (DiÓptiBa) financiado por MCIN/AEI/10.13039/501100011033 y por la Unión Europea NextGenerationEU/PRTR · Proyecto PR-NMN-01-2023-000444 (OneBESS) financiado por la Unión Europea — NextGenerationEU, a través del IDAE (Ministerio para la Transición Ecológica y el Reto Demográfico), en el marco del Plan de Recuperación, Transformación y Resiliencia.

We use our own and third-party cookies to improve our services, analyse traffic and personalise content. You can accept, reject or configure them at any time. Cookie policy