Discover our solutions designed for each sector and maximize the value of your energy investments.
Secure the value of your energy assets with solutions designed for each project phase.

Home / Solutions/
One Hub Energy not only provides project development management services on behalf of the investor, based on its regulatory, normative and technical-economic expertise, but also optimizes renewable energy projects, including technical improvements such as hybridization with other generation technologies and/or energy storage, as well as repowering and/or modernization of existing facilities.
Our team is not limited to traditional consulting; we participate in project development, liaise with the main suppliers in the sector and actively influence regulatory bodies to promote the changes necessary for the success of the energy transition in Spain.
We optimize renewable
renewable energy projects
With technical improvements such as hybridization with other generation technologies and/or energy storage.
Technical prefeasibility assessment for asset optimization:
Project site study and location identification for optimization: One Hub Energy will evaluate the suitability and technical conditions of one or more potential sites. The identified project site will be selected based on the requirements of the area, as well as the topological and orographic conditions of the site, among other criteria.
Basic engineering design: A preliminary engineering and design of the plant project will be prepared. The preliminary design will seek to maximize the installed capacity without over-committing civil works and earthworks and their associated costs.
Detailed analysis of the regulatory framework:
Summarize relevant current regulation and legislation: In the case of Spain, regulation has had to address certain modifications to allow the development and operation of hybridization and BESS projects, and also to allow participation in different markets. This section includes an overview of the regulatory framework, as well as the main licensing processes, along with the main authorities involved, key deadlines and administrative milestones, and the guarantees required.
Evaluate existing limiting factors and/or regulatory deficiencies: Spanish regulation needs to address certain modifications to allow, not only the development and operation of hybridization and BESS projects, but also the possibility to participate in markets such as secondary regulation or adjustment services, which will increase project revenues.
Identify and discuss planned regulatory changes, as well as the expected timetable for implementation: Although there is a hybrid system with storage facilities, there are still
Project development management on behalf of the company:
One Hub Energy will manage, on behalf of the investor, the full technical and administrative development of the hybrid assets until they reach Ready-to-Build (RTB) status.
Pre-feasibility study for a 20MWp PV + BESS self-consumption project in Kenya for Kenya Railways.
Strategy development and feasibility study for Heavy Vehicle Refueling Stations. Tender management and selection of the optimal partner.
PV project evaluation for the acquisition of a 50MW plant in Spain.
PV project evaluation for the acquisition of two plants totaling 62MW in Spain.
PV project evaluation for the acquisition of a 32.3MW plant in Spain.