Prefeasibility Study 20 MWp self-consumption for Kenya Railways

Pre-feasibility study for a 20MWp PV + BESS self-consumption project in Kenya.

Customer
Promotion

Location
Kenya

Power
20 MWp

Date
2025

Share project

Project

Designed PV 500kWp rooftop + 400kWh BESS installation & 20MWp ground-mounted PV installation + 4MWh BESS installation
Paybacks considered for 7 years.

  • Technical and economic pre-feasibility study of a 20MWp rooftop and ground-mounted PV and BESS self-consumption project to serve a series of electrical substations of a railway infrastructure in Kenya.
  • Estimation of hourly demand curves.
  • Modeling and hourly energy simulation for sizing the energy solution (PV + BESS).
  • Risk analysis and financing structuring and planning.

 