Home / Customers / Case Studies /

QENERGY

QENERGY

BESS Project Evaluation

Technical studies on the hybridization of three 25 MW PV projects with battery storage; assessment of economic feasibility; and complete preparation of documentation for CAPEX (PRTR) grant application.

Customer
QEnergy

Location
Spain

Power
75 MW / 150 MWh

Date
2023

Share project

Project

Review of the regulatory framework and planning for the development of hybridization.
Summary of current regulations, identification of deficiencies and forecast of administrative and market updates, as well as time and budget planning for the development of hybridization.

Techno-economic evaluation of the hybridized PV + BESS plant.
Detailed analysis of an optimized hybridization project to incorporate energy storage (BESS) in a photovoltaic plant in RTB phase, based on its potential to increase energy production and mitigate the risks associated with low PV capture prices. Economic feasibility study and valuation using our proprietary dispatch model and BESS "price-taker" to estimate long-term revenues. Support in the preliminary configuration of the financial feasibility model.

Technical solution and basic engineering
Selection of the most suitable plant configuration and sizing for hybridization. Preparation of the basic engineering documentation, including technical drawings and the necessary documentation for updating the network access request.

Comprehensive support in the development of grant applications
Comprehensive management of the preparation of grant applications to secure CAPEX funding for the PV + BESS hybrid project. The submitted application obtained an allocation of more than €1.2 M in funding.